9 Men, 9 Kilometers
Nine men, nine kilometers of road: Station 1 tells the story of the construction of the Loser road and the dedication of the people who made the project possible.
All stations ›The Loser Panoramic Road
1969–1976: A Road Is Built
Begun in 1969 and completed in 1976, the Loser road was a technical masterpiece of its time. Just nine men worked with heavy equipment and tons of explosives to build the nine-kilometer-long road.
The section of road from hairpin bend 11 onward is considered the most technically challenging part. This section alone took three years to build.
Station: 9 Men, 9 Kilometers
Asphalt paving work between hairpin bends 12 and 13. Loser Bergbahnen
Station 1
A Joint Project for Altaussee
The local population contributed to the financing: salt mine workers gave up one hundred schillings of their wages ten times over. In addition, numerous locals and second-home owners subscribed thousands of schillings to secure a future for tourism in Altaussee.
The Loser owes its convenient accessibility in summer and winter to the pioneers around Josef Buttinger. Alongside salt mining on the Sandling, the station text describes tourism on the Loser as an important economic factor and the mountain as a local recreation area with a wide range of mountain sports opportunities.
Station: 9 Men, 9 Kilometers
Images from the Station
Insights & Memories
Road construction in rocky terrain above hairpin bend 11. Loser Bergbahnen
Historic share certificate for the construction of the Loser road. Loser Bergbahnen
Workers and equipment during the construction of the Loser Panoramic Road. Loser Bergbahnen
Image credits for the station: Marl-Buttinger, DI Hofer, Loser Bergbahnen Archive.